The existing sewer easement for this project was located close to a heavily trafficked highway and many commercial buildings, which meant coordinating with electric company and DOT authorities to minimize disruptions.
Scope of Work
- 2,300 linear feet of 16-inch DIP gravity sewer
- 2,800 linear feet of 10-inch DIP force main
- 11 manholes
- Connections to existing sewer line structures
- 650 linear feet of trenchless jack and bore installations
- Roadway restoration including concrete sidewalks and driveways