Project · Charlotte, NC

McAlpine Project

The McAlpine Project involved replacing an aerial segment of the existing 48" Interceptor. The existing pipeline was not designed as an aerial, but over time, erosion of a small tributary stream caused the pipe to be exposed. The work was performed as part of an On Call Sanitary Sewer and Stream Repair Project.

The work included a major bypass of flows while we replaced the pipe. The newly installed pipe was 50 ft long sections of steel with specialty coatings.

Project Gallery · 6 photos

Rebuilding. Replacements. Repairs. Relationships.

Advertising a water or sewer solicitation? Add us to your bidders list.

Owners, engineers and general contractors: send us ITBs, RFQs and RFPs for utility work and our estimating team will confirm receipt.

704-395-0672
Share a Solicitation