Project · Charlotte, NC
McAlpine Project
The McAlpine Project involved replacing an aerial segment of the existing 48" Interceptor. The existing pipeline was not designed as an aerial, but over time, erosion of a small tributary stream caused the pipe to be exposed. The work was performed as part of an On Call Sanitary Sewer and Stream Repair Project.
The work included a major bypass of flows while we replaced the pipe. The newly installed pipe was 50 ft long sections of steel with specialty coatings.